Energy adviser costs: what is left after the grant

To see your energy adviser costs, enter the fee for specialist planning and site supervision and the number of homes. The tool shows the BAFA grant and your share.

Adviser’s planning and site supervision after the grant

Example: house, €4,000 fee for planning and supervision. Change the figures to see your own result.

Grant

€2,000

You pay yourself€2,000
Funded at most€5,000

Next step: Apply for the supervision in the same BAFA application as the works, before they start.

Details
Rate50%
Sources

BEG EM guideline, nos 8.3.1 b and 8.4.7

Grant for the works →

A funded renovation needs an energy adviser twice. First for the advice, usually with a renovation roadmap, which BAFA subsidises through a separate programme. Then for the specialist planning and site supervision of the measures: the adviser plans the details, checks the technical minimum requirements, supervises the work and confirms the result. For this second service BAFA pays a 50% grant under the BEG EM guideline. Eligible cost is capped at €5,000 for one- and two-family houses and, from 3 homes, at €2,000 per home, with an overall maximum of €20,000. The grant comes on top of the grant for the measure and is claimed in the same application. For an efficiency house renovation with the KfW loan, site supervision also gets 50% as a repayment grant.

Site published by Radif Partners, independent: not an energy adviser, not an authority, no commission. · Editorial policy · Method and sources

Everything explained: Adviser costs ›

The caps

Specialist planning and site supervision (BEG EM)
Homeseligible at mostgrant at most
1€5,000€2,500
2€5,000€2,500
3€6,000€3,000
6€12,000€6,000
12€20,000€10,000

The caps are in number 8.3.1 letter b of the BEG EM guideline, the rate in number 8.4. The grant is half the eligible cost. Example: a fee of €4,000 for a detached house brings a €2,000 grant; a fee above the cap brings no more than €2,500.

Two kinds of adviser costs

BAFA funds advice with a renovation roadmap through a separate programme, at 50% and capped at €650 for one- and two-family houses; details under iSFP funding. Specialist planning and site supervision, by contrast, belong to the measure and are applied for with it. Whether the roadmap pays at all is shown by the iSFP tool.

What supervision delivers

The adviser draws up the technical project description for the application, checks quotes against the technical minimum requirements, inspects the work on site and confirms compliance on completion. Errors in insulation thickness, junctions or window values are thus caught before acceptance, not at the proof-of-use stage. The grant for the measures themselves is calculated by the BAFA tool.

For an efficiency house renovation

Anyone renovating with KfW loan 261 also gets 50% of planning and supervision costs as a repayment grant, under information sheet 261.

Frequently asked questions

Tap a question to see the answer.

Is site supervision mandatory?

For envelope and building-services measures an energy efficiency expert must be involved in the application, as for any application with the iSFP bonus. On completion the expert confirms the technical minimum requirements and the eligible costs. Supervision beyond that is voluntary but funded.

Can the same adviser do the roadmap and the supervision?

Yes. Many owners hire the same adviser because they already know the house. The two services are funded separately, though: the roadmap through the residential energy advice programme, supervision through the BEG. Make sure the invoices show the services separately.

When must I hire the adviser?

Planning services may be provided before the grant application without the project counting as started. You can therefore involve the adviser early, have the measure planned and then apply. Sign with the contractor subject to the grant; that contract must exist when you apply.

Do adviser costs count against the ceiling for the measures?

No. Specialist planning and site supervision have their own cap. They do not reduce the room for insulation, windows and ventilation. You can use the full ceiling for the measures and have the supervision funded on top, in the same BAFA application.

Related pages and calculators

Sources

Written by

Publisher of independent calculators on the German energy performance certificate and renovation grants

Updated on · Editorial policy · Contact

Figures for 2026, figures checked on